We plan to continue to strengthen our risk management system in 2007. We strive to constantly improve our accumulation monitoring systems for accumulating risk-related data, particularly those related to natural and man-made catastrophes. We are continuing to develop our modeling for natural catastrophes and to combine results with geographical information systems. We also continue to develop our monitoring and early warning systems related to “Emerging Risks”, which are new and developing or existing risks that are difficult to quantify in terms of frequency and severity of potential losses. Therefore, these Emerging Risks are generally characterized by major uncertainty. Discontinuities in the evolution of a risk are often driven by scientific-technological, socio-political or legal and regulatory changes.
In 2007, the Group Risk function at Allianz SE plans to embark on a multi-year project to consolidate all Allianz Group-related risk information, calculations and analysis onto one technology platform. This platform will be centrally hosted and available to support risk staff both in the Group Center and in the operating units around the world. Data from a data warehouse for both finance and risk data will be included on the platform to provide consistency between both areas. It will also be subject to a rigorous but flexible change management process designed to serve as a Solvency II platform.
Furthermore in 2007, we expect to introduce a revised internal risk capital model for life insurance business. The new model is part of an integrated framework addressing the Market Consistent Embedded Value (MCEV) calculation, the assessment of risk capital and the estimation of sensitivity analyses for our life portfolios. When fully introduced, this model is expected to provide significant support to the risk management of our life insurance business.
We also plan to continue our project to evaluate derivatives on the basis of an Allianz Group-wide uniform IT system. In addition, we will further strengthen and clarify our guidelines for handling derivatives.
We are monitoring the Solvency II Project to prepare for the anticipated changes to the European insurance solvency requirements. In particular, we are continuously updating the methodology of our internal risk model to meet future requirements on internal models resulting from this project.